The Bespokeaudio Company writes: “Each pair of transformers are tested multiple times throughout the build process. Not only with test equipment, but with visual checks too. This pair have been soldered to a volume switch and laced, they’ll be tested again before being connected to the source loom and the outputs, at which point we can test the preamp as a whole. The super tidy wiring always makes us smile!”
